PCT Flex

Transform manufacturing operations with one unified platform

PCT Flex helps manufacturers connect the ERP to the shop floor, improve production visibility, streamline quality management, automate workflows, and gain real-time operational control from a single platform.

Solutions

Production Planning & Control

Plan Smarter. Execute Faster. Stay in Control. PCT Flex gives manufacturers complete visibility into production planning and shop floor execution by connecting work orders, scheduling, labor, materials, and real-time production data in one platform. Instead of reacting to delays, your team can proactively manage production, balance workloads, and keep operations moving efficiently.

PCT Flex
MRPMRP
ManufacturingManufacturing
Flex SchedulingFlex Scheduling
TimesheetTimesheet
Flex QMS ProFlex QMS Pro
Job BoardJob Board

Your ERP Should Support Your Operations, Not Create More Work Around Them.

Most manufacturers rely on ERP systems to run critical parts of the business. But when production demands increase, processes evolve, and teams need real-time visibility, many operations begin relying on spreadsheets, paper-based workflows, disconnected systems, and manual workarounds just to get the job done.

The result is lost productivity, delayed decisions, inaccurate data, and limited visibility across the shop floor.

PCT Flex helps bridge the gap between your ERP and daily manufacturing operations, giving teams the tools they need to work smarter, move faster, and operate with confidence.

  • Teams relying on spreadsheets outside the ERP
  • Manual production tracking and reporting
  • Paper-based work instructions and travelers
  • Disconnected workflows between departments
  • Missing shop floor visibility
  • Delayed reporting and operational insights
  • Inventory inaccuracies and material tracking issues
  • Limited traceability and compliance visibility
  • Many More.....

Turn Disconnected Processes Into Connected Manufacturing Operations.

Talk to a Manufacturing Solutions Expert

One Platform to Manage Production, Quality, Inventory, Scheduling & Traceability

PCT Flex is a manufacturing operations platform that helps manufacturers connect the ERP to the shop floor, digitize critical processes, and gain real-time visibility across production, quality, inventory, scheduling, and workforce performance.

Instead of relying on disconnected systems, spreadsheets, paper-based processes, and manual reporting, manufacturers can manage their operations through a unified platform designed specifically for the realities of modern manufacturing.

PCT Flex complements your existing ERP investment while providing the execution, control, and operational visibility needed to improve productivity, quality, and profitability.

Manufacturing operator using PCT Flex on the shop floor

Manufacturing Execution System (MES)

Digitize shop floor operations with electronic work instructions, labor tracking, downtime monitoring, work order execution, operator kiosks, and real-time production reporting.

Business Impact:

Improve productivity, increase visibility, and reduce manual production tracking.

Quality Management System (QMS)

Manage inspections, NCRs, CAPAs, deviations, sampling plans, electronic signatures, and audit trails from a single quality platform.

Business Impact:

Improve compliance, reduce quality issues, and strengthen process consistency.

Warehouse Management System (WMS)

Control receiving, inventory transactions, material movement, cycle counting, picking, staging, and warehouse mobility with real-time inventory visibility.

Business Impact:

Increase inventory accuracy and improve material flow throughout production.

Production Scheduling & Planning

Optimize resources, prioritize work orders, manage capacity, and visualize production schedules through intelligent planning tools.

Business Impact:

Improve on-time delivery and reduce scheduling bottlenecks.

Traceability & Compliance

Track lots, serial numbers, genealogy records, certifications, and manufacturing history with complete audit-ready reporting.

Business Impact:

Improve compliance and gain complete product traceability.

Industrial Connectivity

Connect machines, PLCs, sensors, and production equipment through OPC UA, MQTT, IoT devices, and automated data collection.

Business Impact:

Gain real-time operational intelligence directly from the shop floor.

Discover how MES, QMS, WMS, Scheduling, Traceability, and Industrial Connectivity work together to create a connected manufacturing operation.

Book a Consultation

Built for Manufacturers That Have Outgrown Manual Processes and ERP Limitations

PCT Flex is designed for manufacturers that need greater visibility, control, and flexibility across production, quality, inventory, scheduling, and shop floor operations.

Whether you're managing a growing operation, replacing spreadsheets and paper-based processes, or looking to improve performance across multiple facilities, PCT Flex helps connect your ERP to the realities of day-to-day manufacturing execution.

Designed For:

  • •Aerospace & Defense
  • •Medical Device Manufacturing
  • •Electronics Manufacturing
  • •Metal Fabrication
  • •Industrial Manufacturing

Operations Leaders

Gain real-time visibility into production activity, workforce performance, bottlenecks, and operational KPIs while reducing manual coordination between departments.

Plant Managers

Monitor production status, labor utilization, downtime, and workflow execution from the shop floor to final delivery.

Manufacturing Executives

Improve productivity, increase operational visibility, strengthen quality performance, and make more informed business decisions with real-time manufacturing data.

Quality Managers

Digitize inspections, manage CAPAs and NCRs, maintain audit readiness, & improve quality control processes throughout production.

ERP & IT Teams

Extend ERP functionality without replacing existing systems while maintaining data integrity, integration, security, and scalability.

See How PCT Flex Fits Your Manufacturing Operation

One Platform. Multiple Manufacturing Solutions.

PCT Flex helps solve the practical workflow problems that slow manufacturing teams down. Each solution can be shaped around your process, team structure, ERP environment, and operational goals.

Manufacturing Execution System (MES) screenshot — view 1
Manufacturing Execution System (MES) screenshot — view 2
Manufacturing Execution System (MES) screenshot — view 3

Manufacturing Execution System (MES)

Total Shop Floor Visibility. From Material to Machine.

PCT Flex MES gives manufacturers real-time control over production execution, labor tracking, downtime monitoring, quality checkpoints, machine performance, and work order progress. Connect your ERP directly to the shop floor and gain complete visibility into what is happening across production.

  • Work Order Execution
  • Electronic Work Instructions
  • Labor Tracking
  • Downtime Capture
  • Scrap Reporting
  • Tooling Management
  • Machine Connectivity
  • Production Reporting
◆Improve Production Visibility◆Increase Labor Productivity◆Reduce Downtime◆Eliminate Paper-Based Processes
Quality Management System (QMS) screenshot — view 1
Quality Management System (QMS) screenshot — view 2

Quality Management System (QMS)

Quality Built Into Every Step of Production.

Move beyond spreadsheets and disconnected quality processes. PCT Flex Quality Management helps manufacturers manage inspections, NCRs, CAPAs, traceability, electronic records, audit preparation, and compliance requirements from a single platform.

  • Incoming Inspection
  • In-Process Inspection
  • Final Inspection
  • NCR Management
  • CAPA Management
  • Audit Trails
  • Electronic Signatures
  • Statistical Process Control
◆Reduce Quality Escapes◆Improve Compliance◆Maintain Audit Readiness◆Strengthen Traceability
Warehouse Management System (WMS) screenshot — view 1

Warehouse Management System (WMS)

Warehouse Management Built Around Your Workflow.

Improve inventory accuracy, material movement, warehouse visibility, and fulfillment performance with a warehouse management solution designed specifically for manufacturing environments.

  • Receiving & Putaway
  • Picking & Staging
  • Inventory Tracking
  • Cycle Counting
  • Material Consumption
  • Warehouse Mobility
  • Zebra Scanner Support
  • ERP Integration
◆Improve Inventory Accuracy◆Reduce Material Delays◆Increase Warehouse Efficiency◆Improve Production Readiness
Production Scheduling screenshot — view 1
Production Scheduling screenshot — view 2
Production Scheduling screenshot — view 3

Production Scheduling

Schedule Your Way. Not Your Software's Way.

Plan production based on real-world capacity, operator skills, machine availability, material constraints, and business priorities. PCT Flex Scheduling helps manufacturers make smarter scheduling decisions with complete operational visibility.

  • Finite Capacity Scheduling
  • Resource Planning
  • Work Center Scheduling
  • Production Prioritization
  • Constraint Management
  • Gantt Scheduling
◆Improve On-Time Delivery◆Reduce Scheduling Conflicts◆Increase Resource Utilization◆Improve Production Planning
Machine Connectivity & Industrial IoT screenshot — view 1

Machine Connectivity & Industrial IoT

Connect machines, PLCs, sensors, and industrial equipment to capture real-time production data and gain visibility into machine performance, downtime, cycle counts, and operational efficiency.

  • OPC UA Integration
  • MQTT Connectivity
  • PLC Integration
  • Machine Data Collection
  • OEE Dashboards
  • Downtime Alerts
  • Predictive Maintenance
◆Real-Time Visibility◆Better OEE Performance◆Reduced Downtime◆Faster Decision-Making
ERP Integration & Extension screenshot — view 1

ERP Integration & Extension

Extend Your ERP Without Replacing It.

PCT Flex works alongside your existing ERP investment, filling operational gaps and providing shop floor execution, quality management, inventory visibility, and manufacturing control where traditional ERP systems often fall short.

PCT Flex integrates with virtually any ERP system. Whether you run Oracle NetSuite, SAP, Microsoft Dynamics, or a custom-built platform, PCT Flex connects through APIs and data synchronization — no rip-and-replace required.

◆Protect Existing ERP Investments◆Eliminate Data Silos◆Improve Operational Visibility◆Extend ERP Functionality
PCT Flex Satellite screenshot — view 1

PCT Flex Satellite

Protect Sensitive Manufacturing Data Without Sacrificing Accessibility.

PCT Flex Satellite is designed for manufacturers managing ITAR, CUI, export-controlled, or sensitive technical information. It allows organizations to isolate only the data that requires protection while keeping standard operations accessible through the cloud.

  • Selective Data Isolation
  • Hybrid Cloud & On-Premise Architecture
  • Unified User Experience
  • ERP Compatibility
  • Controlled Product Data Protection
  • Aerospace & Defense
  • Government Contractors
  • ITAR Environments
  • CMMC Programs
  • Export-Controlled Manufacturing
◆Secure Sensitive Data◆Maintain Operational Efficiency◆Avoid Full Air-Gapped Infrastructure◆Preserve User Productivity

Modernize Manufacturing Operations
Without Starting Over

Many manufacturers know they need better visibility, stronger quality control, improved inventory accuracy, and more connected operations.

The challenge is that replacing an ERP system is expensive, disruptive, and often unnecessary.

PCT Flex gives manufacturers a practical way to modernize shop floor operations, quality management, inventory control, scheduling, and production visibility while continuing to leverage existing ERP investments.

  • Long implementation timelines
  • Expensive custom development
  • Limited shop floor functionality
  • Heavy dependence on ERP vendors
  • Difficult to adapt as operations evolve
  • Often lacks manufacturing execution capabilities
  • More disruption to daily operations

Traditional ERP Customization

  • Built specifically for manufacturers
  • MES, QMS, WMS, and Scheduling in one platform
  • Connects directly with existing ERP systems
  • Faster deployment and time-to-value
  • Real-time operational visibility
  • Supports machine connectivity & automation
  • Scales as your business grows

PCT Flex

Implementation Process

A Clear Process From Workflow Discovery to Deployment

STEP 1

Consultation

We understand your current ERP setup, business process, workflow gaps, and operational goals.

STEP 2

Workflow Mapping

We review how your team currently works, where data moves, where delays happen, and where manual effort can be reduced.

STEP 3

Solution Planning

We define the right combination of custom apps, data sync, automation, reporting, or utility tools.

STEP 4

Build & Integration

We create the solution and connect it with your ERP environment where needed.

STEP 5

Testing & Team Support

We test workflows, validate data, support users, and help your team adopt the new process.

STEP 6

Improve & Scale

Once the first workflow is working, you can expand PCT Flex into more departments, processes, or use cases.

Manufacturing Operations Software

Common Questions Answered

A Manufacturing Execution System (MES) helps manufacturers manage, monitor, and track production activities on the shop floor in real time. MES solutions provide visibility into work orders, labor activity, machine performance, downtime events, production reporting, and operational efficiency. By connecting production processes directly to business systems, MES helps manufacturers improve productivity, reduce manual work, and gain better control over manufacturing operations.

Manufacturing professional reviewing production data

Talk with a manufacturing solutions specialist to discuss your workflows, ERP environment, production goals, and operational challenges.

Built for Manufacturers by a Team That Understands Manufacturing Operations

PCT Flex was created to solve the real operational challenges manufacturers face every day—from production visibility and quality management to inventory control, scheduling, traceability, and shop floor execution.

Backed by the team at Paapri Cloud Technologies, PCT Flex combines manufacturing expertise with modern cloud technology to help manufacturers improve operational performance without disrupting existing ERP investments.

FAQ

No. PCT Flex works alongside your existing ERP, extending it with shop floor execution, quality, inventory, and scheduling capabilities rather than replacing your core business system.

PCT Flex integrates with Oracle NetSuite, SAP, Microsoft Dynamics, and custom ERP environments through APIs and data synchronization.

PCT Flex is purpose-built for manufacturers — including aerospace & defense, medical device, electronics, metal fabrication, and industrial manufacturing — where shop floor execution and compliance matter most.

Yes. PCT Flex replaces disconnected spreadsheets and paper-based workflows with connected, real-time manufacturing tools that sync directly with your ERP.

Absolutely. Most manufacturers start with a single high-impact workflow, prove the value, and then expand PCT Flex into more departments and use cases.

PCT Flex is highly configurable. Each solution can be shaped around your process, team structure, ERP environment, and operational goals.

Operations leaders, plant managers, quality managers, manufacturing executives, and ERP/IT teams looking to improve visibility and control across production.

We review your current ERP setup, workflows, and operational goals, identify gaps, and outline how PCT Flex can connect your ERP to day-to-day manufacturing execution.

See What Your Manufacturing Operation Could Look Like With Complete Visibility

Discover how PCT Flex helps manufacturers improve production control, quality performance, inventory accuracy, scheduling efficiency, and operational decision-making—all while leveraging existing ERP investments.